Newspaper Archive of
Post-Gazette
Boston, Massachusetts
Lyft
March 20, 2015     Post-Gazette
PAGE 12     (12 of 16 available)        PREVIOUS     NEXT      Full Size Image
 
PAGE 12     (12 of 16 available)        PREVIOUS     NEXT      Full Size Image
March 20, 2015
 

Newspaper Archive of Post-Gazette produced by SmallTownPapers, Inc.
Website © 2017. All content copyrighted. Copyright Information.     Terms Of Use.     Request Content Removal.




Page 12 POST-GAZE'l-rE, MARCH 20, 2015 iE Gridiron (Continued from Walking out the door. Revis (24) and Browner (39) transformed the Patriots defense for one magical albeit brief season. starting tandem of Arlington and Butler on the corners, they must continue to ad- dress the pass rush, an area in need of tweaking even before the departures of Revis and Browner. The ad- dition of Sheard is a great start, but is yards short of Page 14) being sufficient. Wilfork Signs with Texans It was a move that was ex- pected, and nearly matricu- lated last off-season, but this past Monday, Defensive Tackle Vince Wilfork offi- cially confirmed that he would not be a member of the Patriots in 2015. The 33- year old signed a two-year deal worth $9 million, with $5 million guaranteed to join former Patriots offen- sive coordinator Bill O'Blien and the Houston Texans. In Houston, Wilfork will also be reunited with former Defen- sive Coordinator Romeo Crennel and teammate Mike Vrabel. Wilfork thanked the Patri- ots organization and fans via twitter Monday afternoon. The Kraft family will always B family...Thank you Bill for 11 years I have learned so much it's been an amazing run...My brothers on the field I love you all I wish you suc- MASSACHUSE'R'S PORT AUTHORITY NOTICE TO CONTRACTORS Sealed General Bids for MPA Contract No. L1018-Cl HVAC/MECHANICAL SYSTEM REPLACEMENT, TERMINALS B AND C, BOSTON LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSE'I-rS, will be received by the Massachusetts Port Authority at the Capital Programs Department Office, Suite 209S - Logan Office Center, One Harborside Drive, East Boston, Massachusetts 02128-2909, until 11:00 A,M. local time on WEDNESDAY, APRIL 29, 2015, immediately alter which, in a designated room, the bids will be opened and read publicly. Sealed filed sub-bids for the same contract will be received at the same office until 11:00 A.M. local time on WEDNESDAY, APRIL 15, 2015, immediately after which, in a designated room, the filed sub-bids will be opened and read publicly. NOTE:PRE-BID CONFERENCE WILL BE HELD AT THE CAPITAL PROGRAMS DEPARTMENT (ABOVE ADDRESS) AT 10:00 A.M. LOCAL TIME ON WEDNESDAY, APRIL I, 2015. The work includes THE INSTALLATION OF (5) HVAC UNITS, DEMOLmON OF THE EXISTING HVAC UNITS, AND ARCHITECTURAL, MECHANICAL AND PLUMBING MODIFICATIONS TO THE EXISTING FAN ROOMS NECESSARY TO COMPLETE THE INSTALLATION. Bid documents will be made available beginning WEDNESDAY, MARCH 25, 2015. Bid Documents in electronic format may be obtained free of charge at the Authodty's Capital Programs Department Office, together with any addenda or amendments, which the Authority may issue and a printed copy of the Proposal form. In order to be eligible and responsible to bid on this contract General Bidders must submit with their bid a current Certificate of Eligibility issued by the Division of Capital Asset Management & Maintenance and an Update Statement. The General Bidder must be certified in the category of GENERAL BUILDING CONSTRUCTION. The estimated contract cost is SIX MILLION DOLLARS ($S,O00,000). In order to be eligible and responsible to bid on this contract, filed Sub-bidders must submit with their bid a current Sub-bidder Certificate of Eligibility issued by the Division of Capital Asset Management & Maintenance and a Sub-bidder Update Statement. The filed Sub-bidder must be certified in the sub-bid category of work for which the Sub-bidder is submitting a bid proposal. Bidding procedures and award of the contract and sub-contracts shall be in accordance with the provisions of Sections 44A through 44H inclusive, Chapter 149 of the General Laws of the Commonwealth of Massachusetts. A proposal guaranty shall be submitted with each General Bid consisting of a bid deposit for five (5) percent of the value of the bid; when sub-bids are required, each must be accompanied by a deposit equal to five (5) percent of the sub-bid amount, in the form of a bid pond, or cash, or a certified check, or a treasurer's or a cashier's check issued by a responsible bank or trust 'cempany, payable to the Massachusetts Port Authority in the name of which the Contract for the work is to be executed. The bid deposit shall be (a) in a form satisfactory to the Authority, (b) with a surety company qualified to do business in the Commonwealth and setisfactory to the Authority, and (c) conditioned upon the fa~ful performance by the principal of the agreements contained in the bid. The successful Bidder will be required to furnish a performance bond and a labor and mate~ls payment bond, each in an amount equal to 100% of the Contract price. The surety shall be a surety company or securities satisfactory to the Authority. Attention is celled to the minimum rate of wages to be paid on the work as determined under the provisions of Chapter 149, Massachusetts General laws, Section 26 to 27G, inclusive, as amended. The Contractor will be required to pay minimum wages in accordance with the schedules listed in Division II, Special Provisions of the Specifications, which wage rates have been predetermined by the U. S. Secretary of Labor and/or the Commissioner of Labor and Industries of Massachusetts, whichever is greater. The successful Bidder will be required to purchase and maintain Bodily Injury Liability Insurance and Property Damage Liability Insurance for a combined single limit of $10,000,000. Said policy shall be on an occurrence basis and the Authority shall be included as an Additional Insured. See the insurance sections of Division I, General Requirements and Division II, Special Provisions for complete details. Filed sub-bids will be required and taken on the following classes of work: HEATING, VENTILATING, AND AIR-CONDITIONING $3,500,000 PLUMBING $90,000 ELECTRICAL $300,000 FIRE PROTECTION SPRINKLER SYSTEM $180,000 The Authodty reserves the dght to reject any sub-bid of any sub-trade where permitted by Section 44E of the above-referenced General laws. The right is also reserved to waive any informality in or to reject any or all proposals and General Bids. This contract is subject to a Minority/Women Owned Business Enterprise participation provision requiring that not less than EIGHT AND ONE TENTH PERCENT (8.1%) of the Contract be performed by minority and women owned business enterprise contractors. With respect to this provision, bidders are urged to familiarize themselves thoroughly with the Bidding Documents. Strict compliance with the pertinent procedures will be required for a bidder to be deemed responsive and eligible. This Contract is also subject to Affirmative Action requirements of the Massachusetts Port Authority contained in the Non-Discrimination and Affirmative Action article of Division I, General Requirements and Covenants, and to the Secretary of labor's Requirement for Affirmative Action to Ensure Equal Opportunity and the Standard Federal Equal Opportunity Construction Contract Specifications (Executive Order 11246). The General Contractor is required to submit a Certification of Non-Segregated Facilities prior to award of the Contract, and to notify prospective sub-contractors of the requirement for such certification where the sub-contract exceeds $10,000. Complete information and authorization to view the site may be obtained from the Capital Programs Department Office at the Massachusetts Port Authority. The dght is reserved to waive any informality in or reject any or all proposals. MASSACHUSE'R'S PORT AUTHORITY THOMAS P. GLYNN CEO AND EXECUTIVE DIRECTOR Run date: 3/20/2015 cess & health changing teams will never change our bonds we are brothers forever... To all the fans this is the hardest choice I have ever had to make you guys are my back bone and you guys will always be my heart. @wilfork75 Wilfork spent 11 years in New England, bookended with two World Champion- ships, but most importantly was a class act throughout. "He is the best defensive linemen I ever coached, an all-time great Patriot whose place on our team will be missed but whose re- markable career as a Patriot will be remembered forever." -- Bill Belichick on Vince Wilfork LEGAL NOTICE Commonwealth of Massachusetts The Trial Court Probate and Family Court Middlesex Division 208 Cambridge Street East Cambridge, MA 02141 (617) "r68-5800 Docket No. MI15P0969EA Estate of NIKKI DIANE LOBACH Date of Death February 15, 2008 INFORMAL PROBATE PUBLICATION NOTICE To all persons interested in the above captioned estate, by Petition of Petitioner James Lobach of Richland, WA. James Lobech of Richland, WA has been informally appointed as the Personal Repre- sentative of the estate to serve without surety on the bond. The estate is being administered under informal procedure by the Personal Represen- tative under the Massachusetts Uniform Pro- bate Code without supervision by the Court. Inventory and accounts are not required to be filed with the Court, but interested parties are entitled to notice regarding the administration from the Personal Representative and can petition the Court in any matter relating to the estate, including distribution of assets and expenses of administration. Interested parties are entitled to petition the Court to institute formal proceedings and to obtain orders terminating or restricting the powers of Per- sonal Representatives appointed under infor- mal procedure. A copy of the Petition and Will, if any, can be obtained from the Petitioner. Run date: 3/20/15 LEGAL NOTICE Commonwealth of Massachusetts The Trial Court Middlesex Probate and Family Court 208 Cambridge Street Cambridge, MA 02141 (817) 768-5800 Docket No. MI15P0774EA Estate of LOIS T. MITCHELL Also known as LOIS T. MITCHELL Date of DeathJanuary 7, 2015 CITATION ON PETITION FOR FORMAL ADJUDICATION To all interested persons: A Petition has been filed by Siobain E. Mitchell of Maynard, MA and Cathy Lynn Raab of Sparks, MD requesting that the Court enter a formal Decree and Order of testacy and for such other relief as requested in the Petition. And also requesting that Cathy Lynn Reab of Sparks, MD and Siohain E. Mitchell of Maynard, MA be appointed as Personal Representative(s) of said estate to serve on the bond. You have the right to obtain a copy of the Petition from the Petitioner or at the Court. You have a dght to object to this proceeding. To do so, you or your attorney must file a written appearance and objection at this Court before 10:00 a.m. on April 9, 2015. This is NOT a hearing date, but a deadline by which you must file a written appearance and objection it you object to this proceed- ing. If you fail to file a timely written appear- ance and objection followed by an Affidavit of Objections within thirty (30) days of the return date, action may be taken without further notice to you. The estate is being administered under formal procedure by the Personal Represen- tative under the Massachusetts Uniform Pro- bate Code without supervision by the Court. Inventory and accounts are not required to be filed with the Court, but recipients are en- titled to notice regarding the administration from the Personal Representative and can petition the Court in any matter relating to the estate, including distribution of assets and expenses of administration. WITNESS, HON. EDWARD F. DONNELLY, JR., First Justice of this Court. Date: March 12, 2015 Tara E. DeCristofaro, Register of Probate Run date: 3/20/15 LEGAL NOTICE LEGAL NOTICE Commonwealth of Massachusetts The Trial Court Middlesex Probate and Family Court 208 Cambridge Street Cambridge, MA 02141 (61 7) 7685800 Docket No. MI15P0960EA Estate of HAROLD EMMETT E. MOOD Date of Death December 23, 2014 CITATION ON PETITION FOR FORMAL ADJUDICATION To all interested persons: A Petition has been filed by Diana L. Mood of Winchester, MA requesting that the Court enter a formal Decree and Order of testacy and for such other relief as requested in the Petition. And also requesting that Diana L. Mood of Winchester, MA be appointed as Personal Representative(s) of said estate to serve Without Surety on the bond. You have the right to obtain a copy of the Petition from the Petitioner or at the Court. You have a right to object to this proceeding. To do so, you or your attorney must file a written appearance and objection at this Court before 10:00 a.m. on April 30, 2015. This is NOT a headng date, but a deadline by which you must file a written appearance and objection If you object to this proceed- ing. If you fail to file a timely written appear- ance and objection followed by an Affidavit of Objections within thirty (30) days of the return date, action may be taken without further notice to you. The estate is being administered under formal procedure by the Personal Represen- tstive under the Massachusetts UnIform Pro- bate Cede without supervision by the Court. Inventory and accounts are not required to be filed with the Court, but recipients are en- titled to notice regarding the administration from the Personal Representative and can petition the Court in any matter relating to the estate, including distribution of assets and expanses of administration. WITNESS, HON. EDWARD F. DONNELLY, JR., First Justice of this Court. Date: March 5, 2015 Tara E. DeCdstofaro, Register of Probate Run date: 3/20/15 Commonwealth of Massachusetts The Trial Court Middlesex Probate and Family Court 208 Cambridge Street Cambridge, MA 02141 (617) 768-5800 Docket No. MI15P1159EA Estate of CARL ROBERT QUEANDER Date of Death January.24, 2015 CITATION ON PETITION FOR FORMAL ADJUDICATION To all interested persons: A Petition has been filed by Amy Elizabeth Queander of Watertown, MA requesting that the Court enter a formal Decree and Order of testacy and for such other relief as requested in the Petition. And also requesting that Kristian Dimattso of Waltham, MA be appointed as Personal Representative(s) of said estate to serve Without Surety on the bond. You have the right to obtain a copy of the Petition from the Petitioner or at the Court. You have a right to object to this proceeding. To do so, you or your attorney must file a written appearance and objection at this Court before 10:00 a.m. on April 10, 2015. This is NOT a hearing date, but a deadline by which you must file a written appearance and objection if you object to this proceed- ing. If you fail to file a timely written appear- ance and objection followed by an Affidavit of Objections within thirty (30) days of the return date, action may be taken without further notice to you. The estate is being administered under formal procedure by the Personal Represen- tative under the Massachusetts UnIform Pro- hate Code without supervision by the Court. Inventory and accounts are not required to be filed with the Court, but recipients are en- titled to notice regarding the administration from the Personal Representative and can petition the Court in any matter relating to the estate, including distribution of assets and expenses of administration. WITNESS, HON. EDWARD F. DONNELLY, JR., Rret Justice of this Court. Date: March 13, 2015 Tara E. DeCristofaro, Register of Probate Run date: 3/20/15 MASSACHUSETTS PORT AUTHORITY NOTICE TO CONTRACTORS Sealed General Bids for MPA Contract No. AP1525-C1, FY15-17 AUTHORITY-WIDE TERM AUTOMATIC ENTRANCE DOOR REPAIRS, BOSTON, BEDFORD AND WORCESTER, MASSACHUSETFS, will be received by the Massachusetts Port Authority at the Capital Programs Department Office, Suite 209S, Logan Office Center, One Harborside Drive, East Boston, Massachusetts 02128-2909, until 11:00 A.M. local time on WEDNESDAY, APRIL 22, 2015 immediately after which, in a designated room, the bids will be opened and read publicly. NOTE: PRE-BID CONFERENCE WILL BE HELD AT THE CAPITAL PROGRAMS DEPARTMENT (ABOVE ADDRESS) AT 10:00AM LOCAL TIME ON TUESDAY, APRIL 7, 2015. The work includes PROVISIONS OF LABOR, INCIDENTAL MATERIALS, TOOLS, EQUIPMENT AND SERVICES TO REPAIR AND MAINTAIN AUTOMATIC ENTRANCE DOOR SYSTEMS ON AN AS-NEEDED BASIS OVER A TWO (2) YEAR PERIOD AT ALL MASSACHUSETTS PORT AUTHORITY AVIATION AND NON-AVIATION FACILmES LOCATED AT BOSTON, BEDFORD & WORCESTER, MASSACHUSE'n's. Bid documents will be made available beginning THURSDAY, MARCH 26, 2015. Bid Documents in electronic format may be obtained free of charge at the Authority's Capital Programs Department Office, together with any addenda or amendments, which the Authority may issue and a pdnted copy of the Proposal form. In order to be eligible and responsible to bid on this contract General Bidders must submit with their bid a current Certificate of Eligibility issued by the Division of Capital Asset Management and Maintenance and an Update Statement. The General Bidder must be certified in the category of DOORS AND WINDOWS. The estimated contract cost is TWO HUNDRED SEVENTY-FIVE THOUSAND DOLLARS ($275,000). Bidding procedures and award of the contract and sub-contracts shall be in accordance with the provisions of Sections 44A through 44,.I inclusive, Chapter 149 of the General laws of the Commonwealth of Massachusetts. A proposal guaranty shall be submitted with each General Bid consisting of a bid deposit for five (5) percent of the value of the bid; when sub-bids are required, each must be accompanied by a deposit equal to five (5) percent of the sub-bid amount, in the form of a bid bond, or cash, or a certified check, or a treasurer's or a cashier's check issued by a responsible bank or trust company, payable to the Massachusetts Port Authority in the name of which the Contract for the work is to be executed. The bid deposit shall be (a) in a form satisfactory to the Authority, (b) with a surety company qualified to do business in the Commonwealth and satisfactory to the Authority, and (c) conditioned upon the faithful performance by the principal of the agreements contained in the bid. The successful Bidder will be required to furnish a performance bond and a labor and materials payment bond, each in an amount equal to 100% of the Contract price. The surety shall be a surety company or securities satisfactory to the Authority. Attention is called to the minimum rate of wages to be paid on the work as determined under the provisions of Chapter 149, Massachusetts General laws, Section 26 to 27G, inclusive, as amended. The Contractor will be required to pay minimum wages in accordance with the schedules listed in Division II, Special Provisions of the Specifications, which wage rates have been predetermined by the U. S. Secretary of labor and/or the Commissioner of Labor and Industries of Massachusetts, whichever is greater. The successful Bidder will be required to purchase and maintain Bodily Injury Liability Insurance and Property Damage Liability Insurance for a combined single limit of $1,000,000 (ONE MILLION DOLLARS). Said policy shall be on an occurrence basis and the Authority shall be included as an Additional Insured. See the insurance sections of Division I, General Requirements and Division II, Special Provisions for complete details. No filed sub-bids will be required for this contract. This Contract is also subject to Affirmative Action requirements of the Massachusetts Port Authority contained in the Non-Discrimination and Affirmative Action article of Division I, General Requirements and Covenants, and to the Secretary of labor's Requirement for Affirmative Action to Ensure Equal Opportunity and the Standard Federal Equal Opportunity Construction Contract Specifications (Executive Order 11246). The General Contractor is required to submit a Certification of Non-Segregated Facilities prior to award of the Contract, and to notify prospective sub-contractors of the requirement for such certification where the sub.centract exceeds $10,000. Complete information and authodzation to view the site may be obtained from the Capital Programs Department office at the Massachusetts Port Authority. The dght is reserved to waive any informality in or reject any or all proposals. MASSAGHUSETrS PORT AUTHORITY THOMAS P. GLYNN CEO AND EXECUTIVE DIRECTOR Run date: 3/20/2015 WWW. BOSTON POSTG AZ ETTE,CO M