Newspaper Archive of
Post-Gazette
Boston, Massachusetts
Lyft
April 5, 2013     Post-Gazette
PAGE 15     (15 of 16 available)        PREVIOUS     NEXT      Full Size Image
 
PAGE 15     (15 of 16 available)        PREVIOUS     NEXT      Full Size Image
April 5, 2013
 

Newspaper Archive of Post-Gazette produced by SmallTownPapers, Inc.
Website © 2017. All content copyrighted. Copyright Information.     Terms Of Use.     Request Content Removal.




BOSTON POST-GAZETTE, APRIL 5, 2013 Page 15 LEGAL NOTICE REQUEST FOR QUALIFICATIONS The MASSACHUSETrS PORT AUTHORITY (Authority) is soliciting consulting services for MPA CONTRACT NO. L1018-D1 HVAC EQUIPMENT REPLACEMENT PROJECT. The Authority is seeking a qualified multidisciplinary consulting firm or team, with proven experience to provide professional services including planning, design, and construction related services including resident inspection. The scope of services shall include HVAC systems within terminals B, C and E at Boston Logan International Airport, mechanical equipment and systems within the Central Heating Plant with an emphasis of the chillers, and the steam, high temperature hot water and chilled water distribution systems. The Consultant must be able to work closely with the Authority and other interested parties in order to provide such services in a timely and effective manner. The consultant shall demonstrate experience in multiple disciplines including but not limited to HVAC, Mechanical, Electrical and Plumbing. Ancillary disciplines shall include but not be limited to Architectural, Structural, Code Compliance, Cost Estimating, Construction Phasing, Sustainable Design, and Construction Management with proven experience in MGL Chapter 149A procurement and CM@Risk project delivery. The scope of work shall include, but not be limited to the following: (1) Preparation of a comprehensive inventory of existing HVAC units in the subject terminals considering condition, existing sewice area, proposed service area, capacity and efficiency; (2) Preparation of a detailed assessment of the existing chillers at the Central Heating Plant; (3) Preparation of distribution system models or the updating of existing system models of the steam, chilled water and high temperature hot water distribution systems serving each of the subject terminals; (4) Preparation of a conceptual design report that pdoritizes improvements and recommends a comprehensive construction phasing plan; (5) Preparation of one or more sets of contract documents in accordance with the provisions of th~ Capital Programs Department, Manual II, Guidelines for Consultants; (6) Furnishing of bid phase services in accordance with the provisions of the Capital Programs Department, Manual II, Guidelines for Consultants; (7) Providing construction phase services as may be required based on the procurement methodology selected by the Authority; (8) Providing ancillary services including but not limited to energy modeling and commissioning to support the completion and successfully transfer of the completed work to the Authorities' operating department. The contract will be work order based, and Consultant's fee for each work order shall be negotiated; however, the total fee for the contract shall not exceed $3,000,000. In recognition of the unique nature of the project and the services required to support it, the Authority has scheduled a Consultant Briefing to be held at 10:00 A.M. on Thursday, April 25, 2013 at the Capital Programs Department, Suite 209S, Logan Office Center, One Harborside Drive, East Boston Massachusetts 02128. At this session, an overview of the project will be provided, the services requested by the Authority will be described, and questions will be answered, and a site visit to sample substations will be conducted at the end. Each submission shall include a Statement of Qualifications that provides detailed information in response to the evaluation criteria set forth below and include Architect/Engineer & Related Service,, questionnaires SF 330 (www.gsa.govlportal/forms/downloacY116486)with the appropriate number of Part IIs. Certification of the prime and subcensultants shall be current at the time of submittal and the Consultant shall provide a copy of the certification letter from the Supplier Diversity Office, formedy known as State Office of Minodty and Women Business Assistance (SOMWBA) within its submittal. The Consultant shall also provide an odginal and fourteen copies of litigation and legal proceedings information, signed under the pains and penalties of perjury, in a separate sealed envelope entitled "Litigation and Legal Proceedings". See www.massport.com/doing-business/ Pages/CapitalProgramsResourceCenter.espx for more details on litigation and legal proceedings history submittal requirements. In order to be eligible for selection, all aspects of Section 44, Chapter 7C of the General Laws of the Commonwealth of Massachusetts shall be satisfied including the majority of the firm's Board of Directors or ownership shall be registered in the Commonwealth of Massachusetts in accordance with the applicable provisions of the statute. Consultants shall fumish professional registration status of the firm's board of directors or ownership. All individuals responsible for technical disciplines shall, upon commencement of the project, be registered Architects or Engineers, in that discipline, in the Commonwealth of Massachusetts. The submission shall be evaluated on basis of: (1) current level of experience and knowledge of the team for similar projects, particularly the Project Manager, (2) geographic location and availability of the Project Manager, resident inspectors and other key personnel to be assigned to the project, (3) experience and expertise of subconsultants, (4) demonstrated ability to perform work with minimal disruption to airport operations, (5) familiarity with MGL, including filed sub-bid experience, (6) cost management and scheduling capabilities, (7) affirmative action efforts, please indicate the proposed % of M/WBE participation (8) current level of work with the Authority, (9) past performance for the Authority, if any, (10) experience with sustainable design concepts, and (11) project understanding and technical approach to this project. The selection shall involve a two-step process including the shortlisting of a minimum of three firms based on an evaluation of the Statements of Qualifications received in response to this solicitation followed immediately by a final selection of the consultant by the Authority. The Authority reserves the right to interview the firms prior to final selection, if deemed appropriate. By responding to this solicitation, consultants agree to accept the terms and conditions of Massport's standard work order agreement, a copy of the Authority's standard agreement can be found on the Authority's web page at www.massport.com. The Consultant shall specify in its cover letter that it has the ability to obtain requisite insurance coverage. Submissions shall be printed on both sides of the s_heet (8 1/2" x 11"), no acetate covers. Fifteen (15) copies of a bound document and one PDF version on a disc each limited to: 1) an SF 330 including the appropriate number of Part IIs, 2) resumes of key individuals only each limited to one (1) page under SF 330, Section E, 3) no more than ten (10) projects each limited to one (1) page under SF 330, Section F, 4) no more than 3 sheets (6 pages) of information contained under SF 330 Section H addressing the evaluation items (except for the litigation and legal proceedings history), and 5) no more than 2 sheets (4 pages) of other relevant material not including a 2 page (max.) cover letter, SDO certification letters, covers, dividers, and other required information. This submission, including the litigation and legal proceedings history in a separate sealed envelope as required shall be addressed to Houssam H. Sleiman, PE, CCM, Director of Capital Programs and Environmental Affairs and received no later than 12:00 Noon on Thursday, May 23, 2013 at the Massachusetts Port Authority, Logan Office Center, One Harborside Drive, Suite 209S, Logan International Airport, East Boston, MA 02128-2909. Any submission which is not received in a timely manner shall be rejected by the Authority as non-responsive. Any information provided to the Authority in any Proposal or other written or oral communication between the Proposer and the Authority will not be, or deemed to have been, proprietary or confidential, although the Authority will use reasonable efforts not to disclose such information to persons who are not employees or consultants retained by the Authority except as may be required by M.G.L.c.66. The procurement process for these services will proceed according to the following anticipated schedule: ACCEPTING Advertisements Solicitation: Release Date Wednesday, April 3, 2013 Deadline for submission of written questions Thursday, May 2, 2013 @ 12:00 noon Official answers published (Estimated) Thursday, May 9, 2013 Solicitation: Close Date / Submission Deadline Thursday, May 23, 2013 @ 12:00 noon Times are Eastern Standard Time (US). Questions may be sent via email to CPBidOuestions@massport.com subject to the deadline for receipt stated in the timetable above. In the subject fines of your email, please reference the MPA Project Name and Number. Questions and their responses will be posted on Capital Bid Opportunities webpage of Massport http://www.messport.com/deing-business/_layouts/CapitalPrograms/ default.aspx as an attachment to the original Legal Notice and on Comm-PASS (www.comm-pass. corn) in the listings for this project. MASSACHUSETTS PORT AUTHORITY THOMAS P. GLYNN CEO AND EXECUTIVE DIRECTOR Run date: 04/05/13 LEGAL NOTICE Commonwealth of Massachusetts The Trial Court Middlesex Probate and Family Court 208 Cambridge Street East Cambridge, MA 02141 (617) 768-5800 Docket No, MI13P0807EA Estate of ROBERT A, BOURASSA Date of Death January 17, 2013 INFORMAL PROBATE PUBLICATION NOTICE To all persons interested in the above captioned estate, by Petition of Petitioner Gary J. Bourassa of Lowell, MA a Will has been admitted to informal probate. Gary J. Bouressa of Lowell, MA has been informally appointed as the Personal Representative of the estate to serve Without Surety on the bond. The estate is being administered under informal procedure by the Personal Repre- sentative under the Massachusetts Uniform Probate Code without supervision by the Court. Inventory and accounts are not required to be filed with the Court, but interested parties are entitled to notice regarding the administration from the Personal Representative and can petition the Court in any matter relating to the estate, including distribution of assets and expenses of administration. Interested parties are entitled to petition the Court to institute formal proceedings and to obtain orders terminating or restricting the powers of Personal Representatives appointed under informal procedure. A copy of the Petition and Will, if any, can be obtained from the Petitioner. Run date: 4/5/13 LEGAL NOTICE NOTICE OF PRIVATE SALE Notice is hereby given by TODISCO TOWING OF 94 CONDOR STREET, EAST BOSTON, MA pursuant to the provisions of Mass G.L. c 255, Section 39A that they will sell the following vehicles by private sale on April 29, 2013 at 10:00 a.m. Vehicles are being sold to satisfy their garage keeper's lien for towing, stor- age and notices of sale: 2001 HONDA CIVIC 2HGES25751 H500820 2O05 SCION TC JTKDE177150023394 1994 TOYOTA COROLLA 2T1AE04B2RC056140 2001 DODGE RAM 1B7HC16Y51S152861 2000 OLDSlVOBILE ALERO 1 G3NF52E5YC307331 2000 VOLVO $80 YVITS94D7Y1069468 2001 SAAB 9-5 YS3ED45E1 1 3044488 2000 PLYMOUTH VOYAGER 2C4GJ25RXYR886263 The auction can be viewed at TOWLOT.COM and is open to ever3.,one. Run lares: 4/5, 4/12, 4/19, 2013 7Vae opinions e 79ressed bg our column~ts anacontributors are not necessariy the same as those of The lost-Gazette, its publisher or edtor. Photo sub- missions are tccepted bg the Post-Gazette povided they are clear, or inal potos. There is a $5 charge for tach photo sub- mJttecL Photos art be submitted via e-mail: posOo.zetteC u corn. If you want !our photos re- bamed, include ~ self-addressed. stamped envebpe. EAST BOSTON SATELLITE OFFICE =s NOW OPEN 35 MARIE MATARESE Bennington Street, East Boston 617.227.8929 TUES. 10:00 A.M. - 3.00 P.M. THURS. 11:00 A.M.- 2:00 P.M. General Advertisements Sales and Rentals Memorials Legals ADVERTISING WILL MAKE A DIFFERENCE LEGAL NOTICE MASSACHUSETTS PORT AUTHORITY NOTICE TO CONTRACTORS Sealed General Bids for MPA Contract No. Ll183-C1, K-9 UNIT RELOCATION, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS, will be received by the Massachusetts Port Authority at the Capital Programs Department Office, Suite 209S - Logan Office Center, One Harborside Drive, East Boston, Massachusetts 02128-2909, until 11:00 AM. local time on WEDNESDAY, MAY 8, 2013, immediately after which, in a designated room, the bids will be opened and read publicly. Sealed filed sub-bids for the same contract will be received at the same office until 11:00 A.M. local time on WEDNESDAY, APRIL 24, 2013, immediately after which, in a designated room, the filed sub-bids will be opened and read publicly. NOTE: PRE-BID CONFERENCE WILL BE HELD AT THE CAPITAL PROGRAMS DEPARTMENT AT THE LOGAN OFFICE CENTER, ONE HARBORSlDE DRIVE, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSEI"rS 02128-2909 AT 10:00 AM LOCAL TIME ON FRIDAY APRIL 12, 2013. The work includes: New Construction for Police 1(-9 Unit. The K-9 Unit Facility will be approximately 250' from the main Massachusetts State Police Troop F Headquarters. It will include approximately 1,500 g.s.f, for kennel space to house canines and 1,600 g.s.f, for human occupancy along with vestibule, electrical and mechanical rooms totaling 3,100 g.s.f. It will provide indoor and outdoor kennels for up to 14 dogs and provide 2 workstations allowing for up to 2 troopers to perform reporting and research tasks at a time. Bid documents will be made available beginning WEDNESDAY, APRIL 10, 2013. Bid Documents in electronic format may be obtained free of charge at the Authority's Capital Programs Department Office, together with any addenda or amendments, which the Authority may issue and a printed copy of the Proposal form. In order to be eligible and responsible to bid on this contract General Bidders must submit with their bid a current Certificate of Eligibility issued by the Division of Capital Asset Management and Maintenance and an Update Statement. The General Bidder must be certified in the category of GENERAL BUILDING CONSTRUCTION. The estimated contract cost is $2,183,000. In order to be eligible and responsible to bid on this contract, filed Sub-bidders must submit with their bid a current Sub-bidder Certificate of Eligibility issued by the Division of Capital Asset Management and Maintenance and a Sub-bidder Update Statement. The filed Sub-bidder must be certified in the sub-bid category of work for which the Sub-bidder is submitting a bid proposal. Bidding procedures and award of the contract and sub-contracts shall be in accordance with the provisions of Sections 44A through 44H inclusive, Chapter 149 of the General Laws of the Commonwealth of Massachusetts. A proposal guaranty shall be submitted with each General Bid consisting of a bid deposit for five (5) )ercent of the value of the bid; when sub-bids are required, each must be accompanied by a deposit equal to five (5) percent of the sub-bid amount, in the form of a bid bond, or cash, or a certified check, or a treasurer's or a cashier's check issued by a responsible bank or trust company, payable to the Massachusetts Port Authority in the name of which the Contract for the work is to be executed The bid deposit shall be (a) in a form satisfactory to the Authority, (b) with a surety company qualified to do business in the Commonwealth and satisfactory to the Authority, and (c) conditioned upon the faithful performance by the principal of the agreements contained in the bid. The successful Bidder will be required to furnish a performance bond and a labor and materials payment bond, each in an amount equal to 100% of the Contract price The surety shall be a surety company or securities satisfactory to the Authority. Attention is called to the minimum rate of wages to be paid on the work as determined under the provisions of Chapter 149, Massachusetts General Laws, Section 26 to 27G, inclusive, as amended. The Contractor will be required to pay minimum wages in accordance with the schedules listed in Division II, Special Provisions of the Specifications, which wage rates have been predetermined by the U. S. Secretary of Labor and/or the Commissioner of Labor and Industries of Massachusetts, whichever is greater. The successful Bidder will be required to purchase and maintain Bodily Injury Liability Insurance and Property Damage Liability Insurance for a combined single limit of $1,000,000. Said policy shall be on an occurrence basis and the Authority shall be included as an Additional Insured. See the insurance sections of Division I, General Requirements and Division II, Special Provisions for complete details. Filed sub-bids will be required and taken on the following classes of work: ELECTRICAL FIRE PROTECTION HEATING, VENTILATING, AND AIR-CONDITIONING MASONRY MISCELLANEOUS AND ORNAMENTAL IRON PAINTING PLUMBING ROOFING AND FLASHING WATERPROOFING, DAMP-PROOFING, AND CAULKING The Authority reserves the right to reject any sub-bid of any sub-trade where permitted by Section 44E of the above-referanced General Laws. The right is also reserved to waive any informality in or to reject any or all proposals and General Bids. This contract is subject to a Minority/Women Owned Business Enterprise participation provision requiring that not less than TEN PERCENT (10%) of the Contract be performed by minority and women owned business enterprise contractors. With respect to this provision, bidders are urged to familiarize themselves thoroughly with the Bidding Documents. Strict compliance with the pertinent procedures will be required for a bidder to be deemed responsive and eligible. This Contract is also subject to Affirmative Action requirements of the Massachusetts Port Authority contained in the Non-Discrimination and Affirmative Action article of Division I, General Requirements and Covenants, and to the Secretary of Labor's Requirement for Affirmative Action to Ensure Equal Opportunity and the Standard Federal Equal Opportunity Construction Contract Specifications (Executive Order 11246). The General Contractor is required to submit a Certification of Non-Segregated Facilities prior to award of the Contract, and to notify prospective subcontractors of the requirement for such certification where the subcontract exceeds $10,000. Complete information and authorization to view the site may be obtained from the Capital Programs Department Office at the Massachusetts Port Authority. The right is reserved to waive any informality in or reject any or all proposals. MASSACHUSEI"rS PORT AUTHORITY THOMAS P. GLYNN CEO AND EXECUTIVE DIRECTOR Run date: 04/05/13 j.,- -(