Newspaper Archive of
Post-Gazette
Boston, Massachusetts
Lyft
May 22, 2015     Post-Gazette
PAGE 14     (14 of 16 available)        PREVIOUS     NEXT      Full Size Image
 
PAGE 14     (14 of 16 available)        PREVIOUS     NEXT      Full Size Image
May 22, 2015
 

Newspaper Archive of Post-Gazette produced by SmallTownPapers, Inc.
Website © 2017. All content copyrighted. Copyright Information.     Terms Of Use.     Request Content Removal.




Page 14 POST-GAZETTE, MAY 22, 2015 11f MASSACHUSETTS BREAST CANCER COALITION'S ANNUAL AGAINST THE TIDE STATEWIDE FUNDRAISING EVENTS swims, recreational kayak, cannot attend are invited to Office on the left). recreational walk, and com- make a pledge to a registered or petitive and recreational participant or existing team. Mass Pike to Rte 9E Turn- runs. Participants of all ages Participants may register as pike Road via Exit 23A toward and abilities can choose 1, 2, an individual or as part of a Framingham. Take the RT- or 3 of these exciting activi- team, and are encouraged to 85S ramp toward Hopkinton ties. The event also offers an fundraise $175 ($100, if a / Milford. Turn slightly right Aquathon "Splash and Dash" team member). All proceeds onto Cordaville Road / RT 85. component, where partici- support the Massachusetts Continue to follow Route 85. pants "splash" in the com- Breast Cancer Coalition. DCR Hopkinton State Park petitive 1-mile swim and entrance is on the left. immediately "dash" in the DCR's HOPKINTON DCR's NICKERSON competitive 5K or 10K run STATE PARK STATE PARK (chosen by the participant). 268 Cedar Street, 3488 Main Street, MBCC is inviting people Hopkinton, MA 01748 Brewster 02631 throughout Massachusetts Rte. 1-495 (north or south) From Boston: The Massachusetts Breast and messages of early detec- to register for one or both of to exit 21A, Main Street, - Take Rte. 3 south to the Cancer Coalition (MBCC) will tion, treatment, and finding the events at www.mbcc.org/ Hopkinton. Travel on Main Sagamore Bridge be holding its annual, state- a cure. We depend on our swim or by calling 617-376- Street until the third traffic - Take Rte. 6 to exit 12 in wide Against the Tide swim, generous media and support- MBCC (6222). Those who light located at the heart of Orleans kayak, walk, and/or run era to continue our unique downtown Hopkinton. Turn -Turn left off the ramp onto fundraising events again in goal of breast cancer preven- LEGAL NOTICE left, traveling north on Route Rte. 6A West towards 2015. Proceeds benefit t/on." 85. Proceed approximately 2 Brewster. MBCC, which is the state's The Statewide Metro-Boa- Commonwealth of Massachusetts miles to the DCR's Hopkinton Continue for about 2 leading breast cancer orga- ton Against the Tide will be TheTrial Court State Park entrance on the miles. Park entrance is on nization that seeks to under- held for the 23  year at DCR's Probate and Family Court right (do not enter the Field left. stand the causes of breast Hopkinton State Park (30 Middlesex Division 208 Cambridge Street cancer in order to find ways miles from Boston, 20 miles East Cambridge, MA 02141 NOTICE TO TRADE CONTRACTORS to prevent the disease, from Worcester) on Saturday, (617) 768-5800 REQUEST FOR TRADE CONTRACTOR QUALIFICATIONS "We are very fortunate to June 20. The statewide Cape Docket No. MI15P2517EA The MASSACHUSETTS PORT AUTHORITY is soliciting Statements of Qualifications have such tremendous sup- Cod Against the Tide will be Estate of from TRADE CONTRACTORS interested in performing work for L1346-C2, TERMINAL E port from the citizens of Mas- held for the 16 th year DCR's GAlL S. DUSSEAULT RENOVATION ENHANCEMENTS, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, sachusetts demanding Nickerson State Park Date of Death April 3, 2015 MASSACHUSETTS. The Authority is seeking Qualification Statements from Trade Contractors INFORMAL PROBATE who have a demonstrated experience in the construction and implementation of similar work in greater protection of their (Brewster, MA) on Saturday, PUBLICATION NOTICE terms of scale and complexity as required for Terminal E Located at Logan Intemational Airport. children's future health in August 15. To all persons interested in the above In aocordance with Massachusetts construction manager at-risk requirements, MGL Chapter 149A Section 8, Qualification Statements are being requested from trade contractors capable an effort to stop breast can- These family-friendly and captioned estate, by Petition of Petitioner of performing the following classes of work: Waterproofing, Damp-proofing and Caulking, cer before it starts," says inspirational events bring Brenda S. Diana of Wellesley, MA, aWillhas been admitted to informal probate. Tile, Terrazzo, Acoustical Ceilings, Resilient Roors, Painting, Fire Protection, Plumbing, MBCC's Executive Director people from all demographics BrendaS.DianaofWellesley, MAhasbean Heeting, Ventilation, Air Conditioning, Electrical. Cheryl Osimo and Co- together with one goal in informally appointed as the Personal Repre- The proposed project shall include no more than 100,000 SF of new addition space and the Founder of Silent Spring In- mind: breast cancer preven- sentative of the estate to serve without surety renovation of 150,000 SF existing space, located at Terminal E, to accommodate new airline stitute: "MBCC is often over- tion. Both events consist of on thebend, service providers and their fleet of aircraft. The estate is being administered under The construction duration for this phase is approximately twenty (20) months. The estimated value shadowed by larger, national several components: com- informal procedure by the Personal Represen- of work to be performed by trade contractors is as follows: breast cancer organizations petitive and recreational tative under the Massachusetts Uniform Pro- "bate Code without supervision by the Court. Waterproofing, Damp-proofing and Caulking $258,000. Inventory and accounts are not requited to be Tile $1,007,000. MASSACHUSE'I-rS PORT AUTHORITY filed with the Court, but interested parties are Terrazzo $1,135,000. NOTICE TO CONTRACTORS entitled to notice regarding the administration Acoustical Ceilings $34,000. Sealed General Bids for MPA CONTRACT NO. L1201-C3, AIRFIELD WIDE SNOWMELTING from the Personal Representative and can SYSTEM UPGRADE - PHASE I, AT LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, petition the Court in any matter relating to the Resilient Reefs $64,000. MASSACHUSETTS 02128-2909, will be received by the Massachusetts Port Authority at estate, including distribution of assets and Painting $411,000. the Capital Programs Department Office, Suite 209S, Logan Office Center, One Harberside eoenses of administration. Interested parties Fire Protection $1,427,000. Drive, East Boston, Massachusetts 02128-2909, until 11:00 A.M. local time on WEDNESDAY, are entitled to petition the Court to institute JUNE 17, 2015 immediately after which, in a designated room, the bids will be opened and read formal proceedings and to obtain orders Plumbing $2,700,000. terminating or restdcting the powers of Per- Heating, Ventilation, Air Conditioning $10,804,000. publicly, sonal Representatives appointed under infer- Electrical $10,700,000. NOTE: PRE-BID CONFERENCE WILL BE HELD AT THE CAPITAL PROGRAMS real procedure. A copy of the Petition and Will, The Authority is implementing this project in accordance with MGL Chapter 149A, Sections 1 thru DEPARTMENT OFFICE, SUITE 209S, LOGAN OFFICE CENTER, ONE if any, can be obtained from the Petitioner. 13. This selection of trade contractors conforms to MGL Chapter 149A, Section 8, sub-sections HARBORSlDE DRIVE, EAST BOSTON, MASSACHUSETrS 02128-2909 AT Run date:5/22/15 10:00 A.M. LOCAL TIME ON TUESDAY JUNE 9 2015. (b) to (k) inclusive. This Request for Qualifications (RFQ) will be utilized to prequality trade The work includes DEMOLITION AND DISPOSAL OF EXISTING DIESEL FIRED SNOWMELTER contractors capable and experienced in the construction of parking garages and terminal buildings. The Authority shall utilize a two-step process including the prequalification of trade contractors AND INSTALLATION OF NEW OWNER SUPPLIED GAS FIRED SNOWMELTER. SPECIFIC based on an evaluation of the Statement of Qualifications received in response to this solicitation, ITEMS OF WORK INCLUDE REMOVAL AND DISPOSAL OF EXISTING SNOWMELTER LEGAL NOTICE followed by an Invitation to Bidders that will only be issued to the prequalified trade contractors. AND INFRASTUCTURE INCLUDING FUEL TANK AND MELTING PIT; CONSTRUCTION A Prequalification Committee consisting of four representatives, one each from the Designer OF NEW SNOWMELTER INFRASTRUCTURE; UTILITY CONNECTIONS; SNOWMELTER Commonwealth of Massachusetts and the CM at Risk and two Massport staff. This Prequalitication Committee will be conducting INSTALLATiON AND COMMISSIONING. The Trial Court a qualifications-based evaluation of submittals received from interested trade contractors in order Bid documents will be made available beginning WEDNESDAY, MAY 27, 2015. Middlesex Probate and Family Court to identify prequalifled trade contractors who will be invited to respond to a written Invitation to Bid Documents in electronic format may be obtained free of charge at the Authority's Capital 208 Cambridge Street Bidders. Please note that the Authority is not utilizing this process to prequalify sub-contractors Programs Department Office, together with any addenda or amendments, which the Authority may Cambridge, MA 02141 who are not trade contractors which shall be done separately in accordance with MGL C149A, issue and a printed copy of the Proposal form. (617) 768-5800 Section 8, sub-section (j). The estimated contract cost is SEVEN HUNDRED SIXTY-FIVE THOUSAND DOLLARS Docket No. MI15P2500EA Qualification Statements shall be evaluated in accordance with the following criteria; (1) ($765,000). Estate of Management Experience; (2) Project References including a Public Project Record and (3) A proposal guaranty shall be submitted with each General Bid consisting of a bid deposit for MARIA SOUSA BAIROS Capacity to Complete including a demonstration that the contractor has the financial stability and five (5) percent of the value of the bid; when sub-bids are required, each must be accompanied Date of Death March 21, 2015 long-term viability to successfully implement the Project. A Supplemental Information Package by a deposit equal to five (5) percent of the sub-bid amount, in the form of a bid bond, or cash, CITATION ON PETITION FOR that discusses these Evaluation Criteria and the Prequalification Process in more detail as well or a certified check, or a treasurer's or a cashier's check issued by a responsible bank or trust FORMAL ADJUDICATION as any other requirements for the Qualification Statements will be available to interested parties beginning May 28, 2015, by contacting Susan Brace at 617-568-5961 or via email at sbrace@ company, payable to the Massachusetts Port Authority in the name of which the Contract for the To all interested persons: massport.com work is to be executed. The bid deposit shall be (a) in a form satisfactory to the Authority, (b) with A Petition has been filed by Jose S. Bairos a surety company qualified to do business in the Commonwealth and satisfactory to the Authority, of Btiledca, MA requesting that the Court enter A Project Briefing will be held on Wednesday, June 10, 2015, at 9:00 AM in the Capital Programs and (c) conditioned upon the faithful performance by the principal of the agreements contained a formal Decree and Order of testacy and for Department, Logan Office Center, 2nd floor, 1 Harborside Drive, East Boston, MA. Attendance at in the bid. such other relief as requested in the Petition. the briefing is not mandatory, however, it is strongly encouraged in order to best familiarize your The successful Bidder will be required to furnish a performance bend and a labor and materials And also requesting that Jose S. Bairoa of firm with the project details and the prequalification process. payment bond, each in an amount equal to 100% of the Contract price. The surety shall be a Billerica, MA be appointed as Personal Seven (7) copies of a bound document each limited to 20 sheets (40 pages), exclusive of covers surety company or securities satisfactory to the Authority. Attention is called to the minimum rate of Representative(s) of said estate to serve and dividers and resumes which shall be limited to one page, shall be printed on both sides of the wages to be paid on the work as determined under the provisions of Chapter 149, Massachusetts Without Surety on the bond. sheet (8 1/2" x 11") and shall be addressed to Mr. Houssam H. Sleiman, P.E., CCM, Director of General Laws, and Section 26 to 27 G, inclusive, as amended. The Contractor will be required to You have the dght to obtain a copy of the Capital Programs and Environmental Affairs, and received no later than 12:00 Noon on Thursday, pay minimum wages in accordance with the schedules listed in Division II, Special Provisions of Petition from the Petitioner or at the CourL June 25, 2015, at the Massachusetts Port Authority, Logan Office Center, One Harborside Drive, the Spec fleet ons, which wage rates have been predetermined by the U. S. Secretary of Labor and You have a right to object to this proceeding. Suite 209S, Logan International Airport, East Boston, MA 02128-2909. Any submittal that exceeds To do so, you or your attorney must file a the page limit set here or that is not received in the Capital Programs Department by the above /or the Commissioner of Labor and Industries of Massachusetts, whichever is greater, written appearance and objection at this deadline shall be rejected as non-responsive. The successful Bidder will be required to purchaseand maintain Bodily Injury Liability Insurance Court before 10:00 a.m. on July 6, 2015. and Property Damage Liability Insurance for a combined single limit of $1,000,000. Said policy This is NOT a hearing date, but e deadline Questions regarding this RFQ shall be submitted in writing and directed to cpbidquestions@ shall be on an occurrence, basis and the Authority shall be included as an Additional Insured. See by which you must file a written appearance massport.com with the Project name and number included in the subject line of the email. the insurance sections of Division I, General Requirements and Division II, Special Provisions for and objection if you object to this proceed- MASSACHUSETrS PORT AUTHORITY complete details, ing. ff you fail to file a timely written appear- THOMAS P. GLYNN This contract is subject to a Minority/Women Owned Business Enterprise participation provision ance and objection followed by an Affidavit GEe AND EXECUTIVE DIRECTOR requiring that not less than FIVE AND SIX TENTHS PERCENT (5.6%) of the Contract be of Objections within thirty (30) days of the Run date: 5/22/2015 performed by minority and women owned business enterprise contractors. With respect to this return date, action may be taken without provision, bidders are urged to familiarize themselves thoroughly with the Bidding Documents. further notice to you. = ..... Strict compliance with the pertinent procedures will be required for a bidder to be deemed The estate is being administered under responsive and eligible, formal procedure by the Personal Repreesn- tattve under the Massachusetts Uniform This Contract is also subject to Affirmative Action requirements of the Massachusetts Port Authority Probate Code without supervision by the contained in Article 84 of the General Requirements and Covenants, and to the Secretary of Court. Inventory and accounts are not Labor's Requirement for Affirmative Action to Ensure Equal Opportunity and the Standard Federal required to be filed with the Court, but recipi- Equal Opportunity Construction Contract Specifications (Executive Order 11246). enta are entitled to notice regarding the The General Contractor is required to submit a Certification of Non-Segregated Facilities prior administration from the Personal Repreeen- . . - to award of the Contract, and to notify prospective sub-contractors of the requirement for such tative and can petition the Court in any certification where the subcontract exceeds $10,000. matter relating to the estate, Including Complete information and authorization to view the site may be obtained from the Capital distribution of assets and expenses of administration. Programs Department Office at the Massachusetts Port Authority. The right is reserved to waive " .- any informality in or reject any or all proposals. WITNESS, NON. EDWARD F. DONNELLY, JR., MASSACHUSETrS PORT AUTHORITY First Justice of this Court. THOMAS P. GLYNN Date: May 11, 2015 CEO AND EXECUTIVE DIRECTOR Tara E. DeCristofaro, Register of probate Post-Gazette, ca:It 617-22 9. : Run date: 5/22/2015 Run date: 5/22/15