POST-GAZETTE, SEPTEMBER 23, 2016 PAGE 15 MASSACHUSEI-rS PORT AUTHORITY NOTICE TO CONTRACTORS Sealed General Bids for MPA Contract No. AP1708-Cl, FY 2017-19 NON-A]RSIDE PAVEMENT REPAIRS - TERM CONTRACT, MASSACHUSETTS PORT AUTHORITY FAClUTIES, BOSTON AND BEDFORD, MASSACHUSETrS, will be received by the Massachusetts Port Authority at the Capital Programs Department Office, Suite 209S, Logan Office Center, One Harbomide Drive, East Boston, Massachusetts 02128-2909, until 11:00 A.M. local time on WEDNESDAY, OCTOBER 19, 2016, immediately after which, in a designated room, the bids will be opened and read publicly. NOTE: PRE-BID CONFERENCE WILL BE HELD AT THE CAPITAL PROGRAMS DEPARTMENT (ABOVE ADDRESS) AT 11:00 AM LOCAL TIME ON THURSDAY, OCTOBER 6, 2016. The work includes EXCAVATION, PAVEMENT SAW CUTTING, BITUMINOUS CONCRETE PAVEMENT PATCHING, MILMNG, AND OVERLAY, CURB SETTING, CASTING ADJUSTMENTS AND STRUCTURE REMODEUNG, CONCRETE PAVEMENT AND SIDEWALKS, PAVEMENT MARKINGS, MAINTENANCE OF TRAFFIC, AND OTHER INCIDENTAL WORK ON AN AS NEEDED BASIS. Bid documents will be made available beginning THURSDAY, SEPTEMBER 29, 2016. Bid Documents in electronic format may be obtained free of charge at the Authority's Capital Programs Department Office, together with any addenda or amendments, which the Authority may issue and a printed copy of the Proposal form. The estimated contract cost is NINE HUNDRED SIXTY THOUSAND DOLLARS ($960,000.00). A proposal guaranty shall be submitted with each General Bid consisting of a bid deposit for five (5) percent of the value of the bid; when sub-bids are required, each must be accompanied by a deposit equal to five (5) percent of the sub-bid amount, in the form of a bid bond, or cash, or a certified check, or a treasurer's or a cashier's check issued by a responsible bank or trust company, payable to the Massachusetts Port Authority in the name of which the Contract for the work is to be executed. The bid deposit shall be (a) in a form satisfactory to the Authority, (b) with a surety company qualified to do business in the Commonwealth and satisfactory to the Authority, and (c) conditioned upon the faithful performance by the principal of the agreements contained in the bid. The successful Bidder will be required to furnish a performance bond and a labor and materials payment bond, each in an amount equal to 100% of the Contract price. The surety shall be a surety company or secunties satisfactory to the Authority. Attention is called to the minimum rate of wages to be paid on the work as determined under the provisions of Chapter 149, Massachusetts General Laws, Section 26 to 27G, inclusive, as amended. The Contractor will be required to pay minimum wages in accordance with the schedules listed in Division II, Special Previsions of the Specie, which wage rates have been predetermined by the U. S. Secretary of Labor and/or the Commissioner of Labor and Industries of Massachusetts, whichever is greater. The successful Bidder will be required to purchase and maintain Bodily Injury Uability Insurance and Property Damage Uabifity Insurance for a combined single limit of ONE MILUON DOLLARS ($1,000,000.00). Said policy shall be on an occurrence basis and the Authority shall be included as an Additional insured. See the insurance seddons of Division I, General Requirements and Division II, Special Provisions for complete details. This Contract is also subject to Affirmative A~on requirements of the Massachusetts Port Au~or/ty conta/ned in the Non-Discrimination and Affirmative Action article of Division I, General Requirements and Covenants, and to the Secretary of Labor's Requirement for Affirmative Action to Ensure Equal Opportunity and the Standard Federal Equal Opportunity Construction Contract Speci~ttoes (Executive Order 11246). The General Contractor is required to submit a Certification of Non-Segregated Fadlities prior to award of the Contract, and to notify prosp~e sub-contractors of the requirement for such certification where the sub-contract exceeds $10,000. Complete information and authorization to view the site may be obtained from the Capital Programs Department Office at the Massachusetts Port Authority. The right is reserved to waive any informality in or reject any or all proposals. MASSACHUSETTS PORT AUTHORITY THOMAS P. GLYNN CEO AND EXECUTIVE DIRECTOR Run date: 9/2"3/2016 MASSACHUSE'n's PORT AUTHORITY NOTICE TO CONTRACTORS Sealed General Bids for MPA Contract No. AP1533-Cl, FY 17-19 RRE PROTECTION TERM CONTRACT, ALL MASSPORT FACILITIES, BOSTON, BEDFORD AND WORCESTER, MASSACHUSETTS, will be received by the Massachusetts Port Authority at the Capital Programs Department Office, Suite 209S, Logan Office Center, One Harborside Drive, East Boston, Massachusetts 02128-2909, until 11:00 A.M. lecal time on WEDNESDAY, OCTOBER 26, 2016 immediately after which, in a designated room, the bids will be opened and read publicly. NOTE: PRE-BID CONFERENCE WILL BE HELD AT THE CAPITAL PROGRAMS DEPARTMENT (ABOVE ADDRESS) AT 10:00 AM LOCAL TIME ON TUESDAY, OCTOBER 4, 2016. The work includes THE PROVISION OF LABOR, TOOLS, EQUIPMENT, SERVICES AND MATERIALS TO INSPECT, TEST, MAINTAIN, AND REPAIR FIRE PROTECTION SYSTEMS AND RRE PUMPS OF VARIOUS EQUIPMENT MANUFACTURERS FOR ALL MASSPORT FACILITIES IN BOSTON, BEDFORD AND WORCESTER, MASSACHUSETTS. Bid documents will be made available beginning THURSDAY, SEPTEMBER 20, 2016. Bid Documents in electronic format may be obtained free of charge at the Authority's Capital Programs Department Office, together with any addenda or amendments, which the Authority may issue and a printed copy of the Proposal fo~. In order to be eligible and responsible to bid on this contract General Bidders must submit with their bid a current Certificate of Eligibility issued by the Division of Capital Asset Management and Maintenance and an Update Statement. The General Bidder must be certified in the category of FIRE PROTECTION SPRINKLER SYSTEMS. The estimated contract cost is THREE MILLION d . ~'"" by Sal Giarratani Slugging Power Plag first. He started back with the that season, the Sox were under Mariners slugger Nelson Cruz Cincinnati Reds when I was in .500 and some 20 games out of is on his way to another 40- kindergarten at St. John School first. Just like the teams during home run season. If he gets on Moon Street. my youth always were. to 40 again, he will be just the Dave Ort/z, Big ~g in Baseball History 24th player to hit at least 40 in the Critic? On September 15, 1963, all three or more straight seasons. Does anyone really care three Alou brothers -- Felipe, Babe Ruth did it seven straight what David Ortiz thinks about Matty, and Jesus -- played the seasons, averaging 49 homers Donald Trump's immigrationoutfield together for the San per season from 1926 through plan not being fair to folks. He Francisco Giants in a victory 1932. Sammy Sosa did it six even said the guys he hires at over the Pirates. Red Sox fans straight seasons averaging 55.3 his house are =from Mexico" had dreams of the Conigliaro per season; but remember that and are =hard workers." Bully brothers -- Tony, Billy, and was during the Steroid Era. for Big Papi. Does he know if Richie. Never happened. It's Same holds true for A-Rod, they're here legally? I am not nice to think about where we who hit the mark six straight anti-immigrant, I am anti-illegal were back then, isn't it? seasons averaging 46.8 in that immigrant. That's all. Trump's l.,otta Homers, Few PJ~s same period, plan is all over the map at Last time I looked, the Mets One of my favorite players, times. However, I am for doing Curtis Granderson had 26 Ken Griffey Jr., did five straight something about all the iUegals homers and only 49 RBIs. If he seasons averaging 49.8. Duke flooding America On a daily doesn't surpass 60 RBIs, he will Snyder did it five times in a basis. Something's got to be join a list of eight players who row, too, averaging 41.2 per done about this chronic issue, hit at least 25 homers, but had season between 1953 and 1957. If you don't like Trump's plan, less than 61 RBIs. Others on Not even Mickey Mantle or come up with your own. this short list of sluggers are Willie Mays did it. Two other Remembering Barry Bonds, Rick Monday, and favorite players, Ernie Banks Prs-Red Box Nation Eddie Mathews. Mathews did it and Harmon KiUerbrew, did it Back when I was 15 years for the Boston Braves in 1952 four straight years, old, the Red Sox (bleeped) year when he went 25 and 58. Another great slugger named after year after year, and had So far this season, Granderson Ted Kluszewski did it three a few seasons to go before the has hit 21 solo homers out of his times between 1953 and 1955. Impossible Dream Team gave26 total. Granderson looks like Ted is most remembered for birth to Red Sox Nation. Babe Ruth in this department. cutting off the shoulders of However, in 1963 the Red tlappy Birthday to ... his baseball jersey because Sox had a couple of brightOutfielder Ellis Burks just he was so muscle-bound, moments as Medford's own Bflly turned 52 years old. I always Few remember that baseball Monboquette won 20 games as liked him when he was with the the team's ace, and Dick Stuart Sox. Not a Hall of Famer, but whacked 42 home runs. But a good dependable player with LEGAL NOTICE entering the final month of play good fielding and power. Commonwealth of Massachusetts The Trial Court Middlesex Probate and Family Court Department 208 Cambridge Street Cambridge, MA 02141 (617) 768-5800 Docket No. MI16D3169DR DIVORCE SUMMONS BY PUBLICATION AND MAIMNG MARINA GUTIERREZ VS, LUIS A. PAZ TORREZ To the Defendant:. The Ralntiff has tiled a Cunp~nt for Divorce requesting that the Court grant a divorce for Irretrievable Breakdown of the Marriage lB. The Complaint is on file atihe Court. An Automatic Restraining Order has been entered in this matter preventing you from taking any action which would negatively impact the current financial status of either party SEE Supplemental Probate Court Rule 411.. You are hereby summoned and required to serve upon Madna GuUerrez, 44 Beaver St., Framingham, MA 01702 your answer, it any, on or before October 17, 2016. If ycu fail to de so, the court will proceed to the hearing and adjudi- cation of this action. You are also required to file ; a copy of your answer, if any, in the office of the Register of this CourL Witnass, lION. EDWARD F. DONNBJ.Y, JR,, Rrst Justice of this Court. Date: September 2, 2016 Tara E. DeCnstofare, Register of Probate Run date: 9/23/16 MIRACLE PRAYER Dear Heart of Jesus, in the past I have asked You for many favours. This time, I ask you this very special one (mention favour). Take it, dear Heart of Jesus, and place it within Your own broken heart where Your Father sees it. Then, in His merciful eyes, it will become Your favour, not mine. Amen. Say for three days, promise publica- tion and favour will be granted. KandP PRAYER TO THE BLESSED VIRGIN: DOLLARS (S3,000,000.00). Bidding procedures and award of the contract and sub-contracts shall be in accordance with the provisions of Sections 44A through 44,1 inclusive, Chapter 149 of the General Laws of the Commonwealth of Massachusetts. A proposal guaranty shall be submitted with each General Bid consisting of a bid deposit for five (5) percent of the value of the bid; when sub-bids are required, each must be accompanied by a deposit equal to five (5) percent of the sub-bid amount, in the form of a bid bond, or cash, or a certified check, or a treasurer's or a cashier's check issued by a responsible bank or trust company, payable to the Massachusetts Pod Authority in the name of which the Contract for the work is to be executed. The bid deposit shall be (a) in a form satisfactory to the Authority, (b) with a surety company qualified to do business in the Commonwealth and setisfactory to the Authority, and (c) conditioned upon the faithful performance by the principal of the agreements contained in the bid. The successful Bidder will be required to furnish a performance bond and a labor and materials payment bond, each in an amount equal to 100% of the Contract pdce. The surety shall be a surety company or securities satisfactory to the Authonty. Attention is called to the minimum rate of wages to be paid on the work as determined under the provisions of Chapter 149, Massachusetts General Laws, Section 26 to 27G, inclusive, as amended. The Contractor will be required to pay minimum wages in accordance with the schedules listed in Division II, Spedal Provisions of the Specifications, which wage rates have been predetermined by the U. S. Secretary of Labor and/or the Commissioner of Labor and Industries of Massachusetts, whichever is greater. The successful Bidder will be required to purchase and maintain Bodily Injury Uabifity Insurance and Property Damage Uability Insurance for a combined single limit of TEN MILUON DOLLLARS ($10,000,000). Said policy shall be on an occurrence basis and the Authority shall be included as an Additional Insured. See the insurance sections of Division I, General Requirements and Division II, Special Previsions for complete details. No tiled sub-bids will be required for this contract. This Contract is also subject to Affirmative Action requirements of the Massachusetts Port Authority contained in the Non-Discrimination and Affirmative Action article of Division I, General Requirements and Covenants, and to the Secretary of Labor's Requirement for Affirmative Action to Ensure Equal Opportunity and the Standard Federal Equal Opportunity Construction Contract Specifications (Executive Order 11246). The General Contractor is required to submit a Certification of Non-Segregated Facilities pdor to award of the Contract, and to notify prospective sub-contractors of the requirement for such certification where the sub-contract exceeds $10,000. Complete information and authorization to view the site may be obtained from the Capital Programs Department Office at the Massachusetts Port Authority. The right is reserved towalve any informality in or reject any or all proposals. MASSACHUSETTS PORT AUTHORITY THOMAS P. GLYNN CEO AND EXECUTIVE DIRECTOR Run date: 9/23/2016 ~' ': , (Never Imown to fail) O most beaul~ul flower of Mount Carmel, fruitful vine, splendor of Heaven, Blessed Motber of ttte Son of God, Immaculate Virgin, assist me in my necessity. Oh Star of the Sea, help me and show me here you are my mother. Oh Holy Mary, Mother of God, Queen of Heaven and Earth, I humbly beseech thee from the bottom of my heart to succor me in my necessity (make request). There are none that can withstand your power. Oh Mary, conceived without sin, pray for us who have recoume to thee (3 times). Holy Mary, I place ~is cause in your hands (3 times). Say this prayer 3 consecutive days and then publish, and it will be granted to you. Grateful thanks. T.M.S. MASSACHUSETTS PORT AUTHORITY NOTICE TO CONTRACTORS Sealed General Bids for MPA Contract No. L1354-C2, CENTRAL HEATING PLANT COOUNG TOWER EXTENSIONS, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS, will be received by the Massachusetts Pod Authority at the Capital Programs Deparbnont Office, Suite 209S, Logan Office Center, One Harborside Drive, East Boston, Massachusetts 02128-2909, until 11:00 A.M. local time on WEDNESDAY, OCTOBER 19, 2016 immediately after which, in a designated room, the bids will be opened and read publicly. NOTE: PRE-BID CONFERENCE WILL BE HELD AT THE CENTRAL HEATING PLANT/FAClI.mES I, 600 TERMINAL E EXTENSION AT 10:00 AM LOCAL TIME ON WEDNESDAY, OCTOBER 5, 2016. The work includes THE WORK INCLUDES INSTALLATION OF NEW MINIMUM 18 FOOT HIGH FAN STACKS ON THE EXISTING COOLING TOWER; STRUCTURAL REINFORCEMF.NT OF THE EXISTING FAN DECK AND STRUCTURE OF EACH CELL TO SUPPORT THE ADDED WBGNT, AS WELL AS THE INCREASED WIND AND SEISMIC LOADS; PHASING SO THAT THREE CELLS ARE ALWAYS AVAILABLE DURING THE COOUNG SEASON, REQUIRED RIGGING AND DISPOSAL OF ALL REMOVED MATERIALS AND WASTE FROM THE NEW WORK. Bid documents will be made available beginning THURSDAY, SEPTEMBER 29, 2016. Bid Documents in electronic format may be obtained free of charge at the Authority's Capital Programs Department Office, together with any addenda or amendments, which the Authority may issue and a printed copy of the Proposal form. In order to be eligible and responsible to bid on this contract General Bidders must submit with their bid a current Certificate of Eligibility issued by the Division of Capital Asset Management and Maintenance and an Update Statement. The General Bidder must be certified in the category of MECHANICAL SYSTEMS. The estimated contract cost is RYE HUNDRED FIVE THOUSAND DOLLARS ($505,000.00). Bidding procedures and award of the contract and sub-contracts shall be in accordance with the provisions of Sections 44A through 44,1 inclusive, Chapter 149 of the General Laws of the Commonwealth of Massachusetts. A proposal guaranty shall be submitted with each General Bid consisting of a bid deposit for five (5) percent of the value of the bid; when sub-bids are required, each must be accompanied by a deposit equal to five (5) percent of the sub-bid amount, in the form of a bid bond, or cash, or a certified check, or a treasurer's or a cashier's check issued by a responsible bank or trust company, payable to the Massachusetts Port Authority in the name of which the Contrect for the work is to be executed. The bid deposit shall be(a) in a form satisfactory to the Authority, (b) with a surety company qualified to do business in the Commonwealth and satisfactory to the Authority, and (c) conditioned upon the faithful performance by the principal of the agreements contained in the bid. The successful Bidder will be required to fumish a performance bond and a labor and materials payment bond, each in an amount equal to 100% of the Contract price. The surety shall be a surety company or securities satisfactory to the Authority. Attention is called to the minimum rate of wages to be paid on the work as determined under the provisions of Chapter 149, Massachusetts General Laws, Section 26 to 27G, inclusive, as amended. The Contractor will be required to pay minimum wages in accordance with the schedules listed in Division II, Spedal Provisions of the Specifications, which wage rates have been predetermined by the U. S. Secretary of Labor and/or the Commissioner of Labor and Industries of Massachusetts, whichever is greater. The successful Bidder will be required to purchase and maintain Bodily Injury Liability Insurance and Property Damage Uability Insurance for a combined single limit of ONE MILLION DOLLARS ($1,000,000.00). Said policy shall be on an occurrence basis and the Authority shall be included as an AdditiOnal Insured. See the insurance sodJons of Division I, General Requirements and Division II, Special Provisions for complete details. No filed sub-bids will be required for this contract. This Contract is also subject to Affirmative Ac~on requirements of the Massachusetts Pod Authority contained in the Non-Discrimieation and Affirmative Ac~on article of Division I, General Requirements and Covenants, and to the Secretary of Labor's Requirement for Affirmative Action to Ensure Equal Opportunity and the Standard Federal Equal Opportunity Construction Contract Speci~cat~ns (Executive Order 11246). The General Contractor is required to submit a Cerl~tion of Non-Segregated Facilities prior to award of the Contract, and to notify prosped~ Sub-contractors of the requirement for such certification where the sub-coctract exceeds $10,000. C.,ornp~te information and authorization to view the site may be obtained from the Capital Programs Department Office at the Massachusetts Pod Authority. The right is reserved to waive any informality in or reject any or all proposals. MASSACHUSEFrS PORT AUTHORITY THOIMS P. GLYNN CEO AND EXECUTIVE DIRECTOR Run date: 9/2"3/2016 T