BOSTON POST-GAZETTE, SEPTEMBER 30, 201 1 Page 15 LEGAL NOTICE MASSACHUSETTS PORT AUTHORITY REQUEST FOR TRADE CONTRACTOR QUALIFICATIONS Sealed General Bids for MPA Contract No. AP1208-Cl, FY 2012-14 NON-AIRSIDE PAVEMENT REPAIRS - TERM CONTRACT, MASSACHUSETTS PORT AUTHORITY FACILITIES, BOSTON AND BEDFORD, MA, will be received by the Massachusetts Port Authority at the Capital Programs Department Office, Suite 209S, Logan Office Center, qne Harborside Drive, East Boston, Massachusetts 02128, until 11:00 A.M. local time on WEDNESDAY, OCTOBER 26, 2011 immediately after which, in a designated room, the bids will be opened and read publicly. NOTE: PRE BID CONFERENCE WILL BE HELD AT THE CAPITAL PROGRAMS DEPARTMENT (ABOVE ADDRESS) AT 10:00 AM LOCAL TIME ON THURSDAY, OCTOBER 13, 2011. The workincludes: EXCAVATION, SAW CUI"rlNG, BITUMINOUS CONCRETE PAVEMENT PATCHING AND OVERLAY, PAVEMENT MARKINGS, CURB, CASTING ADJUSTMENTS AND STRUCTURE REMODELED, CONCRETE, MAINTEN- ANCE OF TRAFFIC, AND OTHER INCIDENTAL WORK ON AN AS NEEDED BASIS. Bid documents will be made available beginning WEDNESDAY, OCTOBER 5, 2011. The estimated contract cost is SIX HUNDRED THOUSAND DOLLARS ($600,000.00). Bid Documents in electronic format may be obtained free of charge at the Authority's Capital Programs Department Office, together with any addenda or amendments, which the Authority may issue and a printed copy of the Proposal form. A proposal guaranty shall be submitted with each General Bid consisting of a bid deposit for five (5) percent of the value of the bid; when sub-bids are required, each must be accompanied by a deposit equal to five (5) percent of the sub-bid amount, in the form of a bid bond, or cash, or a certified check, or a treasurer's or a cashier's check issued by a responsible bank or trust company, payable to the Massachusetts Port Authority in the name of which the Contract for the work is to be executed. The bid deposit shall be (a) in a form satisfactory to the Authority, (b) with a surety company qualified to do business in the Commonwealth and satisfactory to the Authority, and (c) conditioned upon the faithful performance by the principal of the agreements contained in the bid. The successful Bidder will be required to furnish a performance bend and a labor and materials payment bond, each in an amount equal to 100% of the Contract price. The surety shall be a surety company or securities satisfactory to the Authority. Attention is called to the minimum rate of wages to be paid on the work as determined under the provisions of Chapter t49, Massachusetts General Laws, Section 26 to 27G, inclusive, as amended. The Contractor will be required to pay minimum wages in accordance with the schedules listed in Division II, Special Provisions of the Specifications, which wage rates have been predetermined by the U. S. Secretary of Labor and/or the Commissioner of Labor and Industries of Massachusetts, whichever is greater. The successful Bidder will be required to purchase and maintain Bodily Injury Liability Insurance and Property Damage Liability Insurance for a combined single limit of ONE MILLION DOLLARS ($1,000,000.00). Said policy shall be on an occurrence basis and the Authority shall be included as an Additional Insured. See the insurance sections of Division I, General Requirements and Division II, Special Provisions for complete details. This Contract is also subject to Affirmative Action requirements of the Massachusetts Port Authority contained in the Non-Discrimination and Affirmative Action article of Division I, General Requirements and Covenants, and to the Secretary of Labor's Requirement for Affirmative Action to Ensure Equal Opportunity and the Standard Federal Equal Opportunity Construction Contract Specifications (Executive Order 11246)• The General Contractor is required to submit a Certification of Non-Segregated Facilities prior to award of the Contract, and to notify prospective subcontractors of the requirement for such certification where the subcontract exceeds $10,000. Complete information and authorization to view the site may be obtained from the Capital Programs Department Office at the Massachusetts Port Authority. The right is reserved to waive any informality in or reject any or all proposals. MASSACHUSETTS PORT AUTHORITY DAVID S. MACKEY INTERIM CHIEF EXECUTIVE OFFICER AND EXECUTIVE DIRECTOR Run date: 9/30/11 LEGAL NOTICE MASSACHUSETTS PORT AUTHORITY REQUEST FOR TRADE CONTRACTOR QUALIFICATIONS The MASSACHUSETTS PORT AUTHORITY is soliciting Statements of Qualifications from TRADE CONTRACTORS interested in performing work for MPA PROJECT NO. L269-C1-3, DESIGN PACKAGE #2 LOGAN CONSOLIDATED RENTAL CAR FACILITY, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSSACHUSETTS. The Authority is seeking Qualification Statements from Trade Contractors who have a demonstrated experience in the construction and implementation of similar work in terms of scale and complexity as required for this project at Logan Airport in East Boston. In accordance with Massachusetts construction manager at-risk requirements, MGL Chapter 149A, Section 44F, Qualification Statements are being requested from trade contractors capable of performing the following classes of work:. (a) masonry; (b) miscellaneous and ornamental iron; (c) waterproofing, damp-proofiog and caulking; (d) roofing and flashing; (e) plumbing; (f) HVAC; (g) electrical; (h) elevators; (i) escalators. The Consolidated Rental Car Facility Southwest Service Area Redevelopment project (COnRAC) includes a four-level 1,200,000 square foot precast concrete parking garage, a 112,000 square feet Customer Service Center (CSC) building, Quick Turnaround Areas (QTAs) for rental car maintenance and storage, including fueling, washing and cleaning facilities. The project includes roadway and intersection improvements, site access improvements, landscaping, and •demolition of an existing flight kitchen building• The project includes site preparation, deep foundations, utility relocations, drainage and grading, temporary roadways and traffic control, elevated roadway structures, construction phasing and sequencing, building structures, architecture, interior finishes, vehicular and pedestrian circulation/wanding, signage/graphics, stairs, elevators, escaators, HVAC, plumbing, fire protection, electrical, lighting, power, security, and other systems and facilities.The total estimated cost of the Project is approximately $187,000,000 and the construction duration is approximately thirty (30) months• The estimated value of work to be performed by trade contractors is as follows: • Masonry - $3,3039,325 • Miscellaneous and Ornamental Iron- $2,566,250 • Waterproofing, Damp-proofing & Caulking - $2,318,620 • Roofing and Flashing - $1,309,825 • Plumbing - $4,315,700 • HVAC - $7,416,425 • Electrical - $18,046,675 • Elevators - $756,000 • Escalators - $1,094,000 The Authority is implementing this project in accordance with MGL Chapter 149A, Sections 1 thru 13. This selection of trade contractors conforms to MGL Chapter 149A, Section 8, subsections (b) to (k) inclusive. This Request for Qualifications (RFQ) will be utilized to prequality trade contractors capable and experienced in the construction of parking structures. The Authority shall utilize a two-step )rooess including the prequalitication of trade contractors based on an evaluation of the Statement of Qualifications received in response to this solicitation, followed by an IrMtation to Bidders that will only be issued to the prequalified trade contractors. A Prequalification Committee consisting of four representatives, one each from the Designer and the CM at Risk and two Massport staff. This Prequalification Committee will be conducting a qualifications-based evaluation of submittals received from interested trade contractors in order to identify prequalified trade contractors who will be invited to respond to a written Invitation to Bidders. Please note that the Authority is not utilizing this process to prequality subcontractors who are not trade contractors which shall be done separately in accordance with MGL C149A, Section 8, subsection (j). Qualification Statements shall be evaluated in accordance with the following criteria; (1) Management Experience; (2) Project References including a Public Project Record and (3) Capacity to Complete including a demonstration that the contractor has the financial stability and long-term viability to successfully implement the Project• A Supplemental Information Package that discusses these Evaluation Criteria and the Prequalification Process in more detail as well as any other requirements for the Qualification Statements will be available to interested parties beginning Friday, September 30, 2011, by contacting Cathy Santosuosso at cs.ntosuosso@masspert.com. Seven (7) copies of a bound document each limited to 20 sheets (40 pages), exclusive of covers and dividers and resumes, which shall be limited to one page, shall be printed on both sides of the sheet (8 ½" x 11") and shall be addressed to Mr. Houssam H. Sleiman, P.E., CCM, Director of Capital Programs and Environmental Affairs, and received no later than 12 Noon, Thursday, October 20, 2011, at the Massachusetts Port Authority, Logan Office Center, One Harborside Drive, Suite 209S, Logan International Airport, East Boston, MA 02128-2909. Any submittal that exceeds the page limit ;et here or that is not received in the Capital Programs Department by the above deadline shall be rejected as non-respensive. Questions regarding this RFQ shall be directed to Ms. Catherine WethereU, Deputy Director, Capital Programs and Environmental Affairs, at 617-568-3501 or via email at ¢wetherell@massoort.com. MASSACHUSETrS PORT AUTHORITY DAVID S. MACKEY INTERIM CHIEF EXECUTIVE OFFICER AND EXECUTIVE DIRECTOR Run date: 9/30/11 • o . CC Sabathia 19 Times Better? Recently, CC Sabathia became the first pitcher to win 19 games in three straight seasons since Vic Raschi did it four times from 1948-51. This year, Sabathia will probably end up a 20 game winner and still not win the Cy Young Award. Dems the breaks, huh? "Liddi Lins Homer Alex Liddi from the Mari- ners hit a home run the other day becoming the first major league baseball player born in Italy to hit a home run since Reno Bertoia did it in 1961 for the Tigers• The Phillies Looking Pretty Good is a Understatement The Philadelphia Phillies look like they've had a fire in their belly since Opening Day back in April. Hey, when former Houston Astros ace Roy Oswalt is your 5 th starter, you know you've got the best starting rotation in all of baseball. LEGAL NOTICE Commonwealth of Massachusetts The Trial Court Middlesex Probate and Family Court 208 Cambridge Street Cambridge, MA 02141 Docket No. MI11D3650DR DIVORCE SUMMONS BY PUBLICATION AND MAILING JOAO ANTONIO CARLOS MACHADO VS. JAYNE MOREIRA DIAS MACHADO To the Defendant: The P(airff has filed a Complaint for Divorce requesting that the Court grant a divorce for Desertion and or Irretrievable Breakdown of the Marriage lB. The Complaint is on file at the Court. An Automatic Restraining Order has been entered in this matter preventing you from taking any action which would negatively impact the current financial status of either party. SEE Supplemental Probate Court Rule 411. You are hereby summoned and required to serve upon: Jose Joaqulm Mscedo Esq., Law Office o1 Jose J. Macedo, 392 Cambridge Street, Cambddge, MA 02141 your answer, if any, on or before October 25, 2011. If you fail to de so, the court will proceed to the hearing and adjudication of this action. You are also required to file a copy of your answer, if any, in the office of the Register of this Court. WITNESS, Hon. PETER C. DiGANGI, First Justice of this Court. Date: September 13, 2011 Tara E. DeCristofaro, Register of Probate Run date: 9/30/11 I LEGAL NOTICE Commonwealth of Massachusetts The Trial Court Middlesex Probate and Family Court 208 Cambridge Street Cambridge, MA 02141 Docket No. MI11D3503DR DIVORCE SUMMONS BY PUBLICATION AND MAILING FELIClA CLARK VS. MELVILLE LUTHER CLARK To the Defendant: The Plaintiff has filed a Complaint for Divorce requesting that the Court grant a divorce for Irretrievable Breakdown of the Marriage lB. The Complaint is on file at the Court. An Automatic Restraining Order has been entered in this matter preventing you from taking any action which would negatively impact the current financial status of either party. SEE Supplemental Probate Court Rule 411. You are hereby summoned and required to serve upon: Felicla Clark, 12 Greenview St., Apt. 207, Frsmingham, MA 01701 your answer, if any, on or before October 21, 2011. If you fail to do so, the court will proceed to the hearing and adjudication of this action. You are also required to file a copy of your answer, if any, in the office of the Register of this Court. • WITNESS, Hon. PETER C. DiGANGI, First Justice of this Court. Date: September 8, 2011 Tara E. DeCristofaro, Register of Probate Run date: 9/30/11 EXTRA Innings by Sal Giarratani September Swoon The Boston Red Sox haven't pulled a September Swoon for a number of sea- sons. We thought all that was over when our "Cowboys" went all the way after being behind the Yankees 0-3 in the 2004 ALCS but appar- ent|y that September infec- tion has returned. The Sox might still hold on but it is pretty bad when the lowly Orioles are doing you in. Killerbrew Listened to Kiner Quite Well Hall of Famer Harmon Killerbrew was one of my baseball heroes growing up in the late '50s and '60s. He was signed by the Washing- ton Senators in 1954 as a 17year-old bonus baby and LEGAL NOTICE Commonwealth of Massachusetts The Trial Court Middlesex Probate and Family Court 208 Cambridge Street Cambridge, MA 02141 Docket No. 11W1704 SUMMONS BY PUBLICATION DEISY AVILA, Plaintiff V. JOSE NAMBO, Defendant i To the above named Defendant: Jose Nambo A Complaint has been presented to this Court by the Plaintiff, Deisy Avila, seeking sole legal and physical custody of minor child Anderson J. Avila. I You are required to serve upon: Ellen Mebel Gabriel, attorney for plaintiff whose address is Greater Boston Legal Service, 197 Friend St. Boston, MA 02114 your I answer on or before October 24, 2011. If you fail to do so, the court will proceed to the hearing and adjudication of this action. You are also required to file acopy of your answer i in the Office of the Register of this Court at Cambridge. WITNESS, Hon. PETER C. DiGANGI, Esquire, First Justice of said Court at Cambridge, this 16 day of September, 2011. Tara E. DeCristofaro, Register of Probate Run date: 9/30/11 I LEGAL NOTICE B & B TOWING 50-R MOONEY STREET CAMBRIDGE, MA 02138 (617)347-9104 TO: ALBERT J. CANTONE 25 WALNUT HILL ROAD SANDOWN, NEW HAMPSHIRE 03873 B & B TOWING HAS HAD IN THEIR POSSESSION 1995 INTERNATIONAL VIN #1HTLAHEL6FHA48288 SINCE MARCH 23, 2010. AFTER DUE NOTICE THIS VEHICLE HAS NOT BEEN CLAIMED. THIS VEHICLE WILL BE SOLD AT PRIVATE SALE IF NOT CLAIMED IN 21 DAYS. SUBMITTED BY B & B TOWING Run dates: 9/30,10/7,10/14/11 LEGAL NOTICE STEPHEN'S AUTO BODY & TOWING 140 TREMONT STREET MELROSE, MA 02176 (781)662-5202 TO: AMANDA SCIMONE 23 PARK DRIVE WOBURN, MA 01801 STEPHEN'S AUTO BODY & TOWING HAS HAD IN THEIR POSSESSION 2005 CADILLAC VlN #1GYEK63N35R185698 SINCE NOVEMBER 9, 2009. AFTER DUE NOTICE THIS VEHICLE HAS NOT BEEN CLAIMED. THIS VEHICLE WILL BE SOLD AT PRIVATE SALE IF NOT CLAIMED IN 21 DAYS. SUBMITTED BY STEPHEN'S AUTO BODY & TOWING Run dates: 9/23, 9/30,10/7/11 I when he arrived at spring training listened to the ad- vice of another Hall of Famer Ralph Kiner. In "Play Like a Hall of Famer," by Steve Krasner, Killerbrew writes, "(Kiner) told me in order to hit a lot of home runs, I'd have to pull the ball more. He suggested I move up on the plate ... so I tried that, and sure enough it worked. My average dropped but I felt that in the long run I was more helpful to the ballclub by ... hitting more home runs." Following Kiner's advice helped him to amass 573 homers and 1,584 RBIs while hitting .256 lifetime. He played in 11 All- Star games and entered the Hall of Fame in 1984. His son Cam said of him, "He had the ability to forget bad games and focus on the task in front of him ... The next day was a new day. LEGAL NOTICE PHIL'S TOWING 333 WEBSTER AVENUE CAMBRIDGE, MA 02140 (617)547-0680 TO: LINDA BROCK 506 MARSHALL ROAD GREENWOOD SOUTH CAROLINA 29646 PHIL'S TOWING HAS HAD IN THEIR POSSESSION 2001 CHRYSLER VIN #2C4GP44361R284649 SINCE SEPTEMBER 26, 2010. AFTER DUE NOTICE THIS VEHICLE HAS NOT BEEN CLAIMED. THIS VEHICLE WILL BE SOLD AT PRIVATE SALE IF NOT CLAIMED IN 21 DAYS. SUBMITTED BY PHIL'S TOWING Run dates: 9/30,10/7,10/14/11 LEGAL NOTICE BOSTONIAN TOWING SERVICE 2 EMERY ROAD WATERTOWN, MA 02134 (617)923-1117 TO: LOGAN GREENLEE 30 HOWARD STREET SOMERVILLE, MA 02144 BOSTONIAN TOWING SERVICE HAS HAD IN THEIR POSSESSION 2000 BMW VIN #WBAAM3341YKC70122 SINCE MARCH 10, 2010. AFTER DUE NOTICE THIS VEHICLE HAS NOT BEEN CLAIMED. THIS VEHICLE WILL BE SOLD AT PRIVATE SALE IF NOT CLAIMED IN 21 DAYS. SUBMITTED BY BOSTONIAN TOWING SERVICE • Run dates: 9/30,10/7,10/14/11 LEGAL NOTICE B & B TOWING 50-R MOONEY STREET CAMBRIDGE, MA 02138 (617)492-5781 TO: HAMZA LUBERG 26 BEACON STREET #25-F BURLINGTON, MA 01803 B & B TOWING HAS HAD IN THEIR POSSESSION YOUR 2000 BMW VIN #WBABM3347YJN82758 SINCE MARCH 19, 2009. AFTER DUE NOTICE THIS VEHICLE HAS NOT BEEN CLAIMED. THIS VEHICLE WiLL BE SOLD AT PRIVATE SALE IF NOT CLAIMED IN 21 DAYS. SUBMITTED BY MIKE SORRENTINO B & B TOWING Run dates: 9/23, 9/30,10/7/11